Skip to main content
Scrumagic
Learn Scrum

Scrum vs Kanban: cadence or flow?

By Scrumagic Team Last reviewed 6 min read

In short

Scrum organises work into fixed-length Sprints with defined roles and events. Kanban organises it as a continuous flow, controlled by limits on work in progress and by explicit policies, with no required roles or meetings. They answer different questions, they can be combined, and the choice usually depends on whether your work arrives as a plan or as a stream.

Teams are often told to choose between Scrum and Kanban, as if one were a newer version of the other. They are two different answers to two different questions. Scrum asks how a team should plan, deliver and learn in regular cycles. Kanban asks how work should move through a system so that value flows smoothly and predictably. A team can use either, both or neither, and a lot of confusion comes from forgetting which question is being asked.

What Kanban is

The Kanban Guide describes Kanban as a strategy for optimising the flow of value through a process. It rests on three practices that work together: defining and visualising the workflow, actively managing the items in it, and improving the workflow.

The first practice produces what the Guide calls a Definition of Workflow. It includes the unit of work, where work starts and finishes, the states in between, how work in progress is controlled, the policies that apply, and a service level expectation based on the team's past cycle time. A Kanban board is the usual way to show it. The second practice means keeping the number of items in progress under control, stopping items from ageing, unblocking stalled work and reviewing active items regularly. Limiting work in progress creates a pull system: new work starts only when there is capacity. The third practice means reviewing and changing the workflow whenever context calls for it.

Four flow metrics belong to Kanban in the Guide: work in progress, throughput, work item age and cycle time. The Kanban Guide prescribes no roles and no fixed meetings or cadence.

What Scrum adds and fixes

Scrum is more prescriptive. It sets a team of three accountabilities, five events, three artifacts, and fixed-length Sprints. Work is chosen at the start of a Sprint, committed to as a Sprint Goal and inspected at its end. It also has a theory to match: empirical process control, with a rhythm designed to produce inspection and adaptation at known times.

The rhythm is the main difference. Scrum batches decisions at the edges of a Sprint. Kanban allows decisions at any time work flows. The Scrum Guide does refer to flow measures: it says that practices such as burn-downs, burn-ups or cumulative flows can help forecast progress, and that they do not replace empiricism.

The differences, side by side

Question Scrum Kanban
Cadence Fixed-length Sprints Continuous, no required cycle
Roles Scrum Master, Product Owner, Developers None prescribed
Work in progress Limited by what the Sprint Backlog holds Limited explicitly, per state or overall
Change during the cycle Protected by the Sprint Goal; scope renegotiated Allowed whenever capacity opens
Commitment Sprint Goal, Product Goal, Definition of Done Service level expectation, policies
Typical metrics Burndown, Sprint Goal outcome, velocity if used Cycle time, throughput, work item age, WIP
Planning Sprint Planning Replenishment as needed

The SBOK® Guide treats Kanban inside its overview of agile methods, describing it as a way of visualising production with aids such as task cards, Scrumboards and burndown charts, and says elsewhere that it aims to show how Scrum concepts align with Kanban, OKRs, DevOps and business analysis.

A worked example: two teams, two kinds of work

This is an illustrative pair. Team A builds a new onboarding flow for a mobile app. The work is a product with a goal, and each piece depends on decisions about what the product should be. A Sprint Goal such as "a new user can set up an account and make a first booking" gives the team a focus, and a review with stakeholders every two weeks checks the direction. Scrum suits it.

Team B runs a support and maintenance desk. Tickets arrive daily, with different sizes and urgencies, and it is hard to know on Monday what will arrive on Thursday. A two-week commitment would be broken by the first urgent bug. The team sets a limit of six items in progress, a rule that urgent items skip the queue but count against the limit, and a goal of resolving ninety percent of tickets within a stated number of days, based on the last quarter's cycle times. Kanban suits it.

The GOV.UK Service Manual makes this same observation: Scrum suits teams building something new or adding features each sprint, while teams running a live service with urgent requests may find sprints restrictive and can move to a flow-based method like Kanban, keeping activities such as stand-ups, retrospectives and regular progress reviews.

Combining them

Many teams use both, and the combination is common enough to have a name, Scrumban. There is no authoritative definition of it. In practice it means a Scrum Team that adds explicit work-in-progress limits and flow metrics to its board, or a Kanban team that adopts a regular retrospective and a planning cadence.

The Scrum Guide does not forbid this. It says Scrum is a container for other techniques and practices. A team that limits WIP inside a Sprint is still doing Scrum as long as the accountabilities, events and artifacts are intact. What it cannot do is drop the Sprint and still call it Scrum, which the Guide's final note rules out.

When to choose which

Some questions help.

  1. Is the work a product being shaped, or a stream being served? Shaped work favours Scrum. Streams favour Kanban.
  2. Do you need a regular point of stakeholder inspection? Scrum builds it in. Kanban leaves it to you.
  3. How often does the order of work change? If priorities shift daily, Sprints may feel like a straitjacket. See change requests in the middle of a Sprint for how Scrum handles it.
  4. Does the team need structure to start with? Scrum is more explicit. Kanban starts from what you do now.
  5. Do you need to predict delivery dates for single items? Cycle time data in Kanban gives a direct answer.

None of these questions is decisive. The honest answer is often to start with the one that fits and borrow from the other.

Two perspectives

Neither source prescribes this, so practice varies.

Scrum Guide

The Scrum Guide does not discuss Kanban, but says Scrum wraps around existing practices or renders them unnecessary, and that flow forecasts such as cumulative flow can be useful without replacing empiricism.

SBOK®

The SBOK® Guide describes Lean Kanban as a visual method that uses aids such as task cards, Scrumboards and burndown charts, and states that it shows how Scrum concepts align with Kanban and other frameworks.

Same thing, different words

  • Sprint Backlog (Scrum Guide) = Sprint Backlog (SBOK)
  • Kanban board (Kanban Guide) = Scrumboard (SBOK)

Neither Scrum source defines a combined method. How to blend Scrum with Kanban practices is a team decision, and the combination called Scrumban has no single definition.

Common mistakes

  • Using a Kanban board and calling it Kanban. A board without work-in-progress limits and explicit policies is a task list.
  • Using Sprints and never inspecting at the end. That is a fixed-length period, not Scrum.
  • Mixing in flow metrics as targets, which tempts people to game them. See how velocity gets misused.
  • Treating one as more mature than the other. The choice is about fit.

How to practise it

If you already use a board, try one change. Add a limit on the number of items in progress and watch what happens to the way people pick up work. In the simulator you get to see how a Sprint's shape affects your choices about scope and WIP.

Sources

  1. The Kanban Guide, Kanban Guides. Read on 14 October 2026.
  2. Agile methodologies, GOV.UK Service Manual. Read on 14 October 2026.
  3. The 2020 Scrum Guide, Scrum Guides. Read on 14 October 2026.

SBOK® is a registered trademark of its owner. Scrumagic is independent and is not affiliated with the owners of SBOK®.

Share this post Link copied

Nothing opened? This computer may have no email program set up. Write it in Gmail or use the copy button and paste the link into your email.

  • Learn Scrum 6 min read

    Change requests in the middle of a Sprint

    Scrum welcomes change, but not inside a running Sprint if it would endanger the Sprint Goal. A new request goes on the Product Backlog for a later Sprint, unless the Sprint would be pointless without it, in which case the Product Owner may cancel. Inside the Sprint, scope can be renegotiated. The Scrum Guide and the SBOK agree on the principle.

  • Learn Scrum 7 min read

    How velocity gets misused, and what it is actually for

    Velocity is how much a team finished in past Sprints, used to forecast how much it can finish in the next. It is a planning aid for the team that produced it. It stops working the moment it is used to compare teams, to rate individuals or to set targets, because people then change the numbers instead of the work.

  • Learn Scrum 7 min read

    The Sprint: a fixed container for turning ideas into value

    A Sprint is a fixed-length event of one month or less, and every other Scrum event happens inside it. It gives a team a regular rhythm of planning, building, inspecting and adapting. Its length is the team's first big planning decision, and the main rule is that the Sprint Goal is not endangered once it starts.

  • Learn Scrum 7 min read

    What is Scrum? A plain-language guide

    Scrum is a lightweight framework for solving complex problems in small steps. One small team works in fixed-length Sprints of a month or less, shows something usable at the end of each one, and uses what it learns to plan the next. This guide explains how that works, and where Scrum deliberately stops.

  • Learn Scrum 6 min read

    Scrum outside software: what carries over and what changes

    Scrum began in product development, not code, and the Guide says it is now used in many domains with essentially complex work. What carries over is the structure: a goal, an ordered list, a small team, a short cycle and a regular inspection. What changes is the meaning of an Increment, the cost of change and the length of a useful Sprint. Here is how to translate each part.

We use analytics cookies to see which pages help and which don't. Scrumagic works the same whichever you choose, and you can change your mind any time from "Cookie settings" in the footer. Privacy Policy.