Scrum-but: when parts of Scrum quietly go missing

By Scrumagic Team Last reviewed 7 min read

In short

"We do Scrum, but we skip the Retrospective." The pattern is called Scrum-but, and the Guide addresses it directly: leaving out elements covers up problems, and implementing only parts is possible but the result is not Scrum. Not every adaptation is Scrum-but. This post gives a test to tell a healthy addition from a harmful omission, with examples and a way to talk about it.

Almost every team that uses Scrum has a sentence that begins "we do Scrum, but". We do Scrum, but our Sprints are six weeks. We do Scrum, but the Product Owner is a committee. We do Scrum, but we skip the Retrospective because it is a waste of time. Some of these sentences describe sensible adaptations. Others describe the quiet removal of the parts that make Scrum work. Telling them apart is one of the most useful skills a Scrum Master has.

What the Guide says

The Guide is unusually firm. In its opening section it says each element of the framework serves a specific purpose that is essential to the overall value and results realised with Scrum, and that changing the core design or ideas of Scrum, leaving out elements or not following the rules covers up problems and limits the benefits, potentially even rendering it useless. In the end note it states that the framework is immutable: while implementing only parts of Scrum is possible, the result is not Scrum, and Scrum exists only in its entirety and functions well as a container for other techniques, methodologies and practices.

Two distinctions are packed in there. Removing or changing the core is what the Guide warns against. Adding practices around the core is what it welcomes: the framework is a container for other techniques. It is also explicit about what lies outside it: patterns, processes and insights that fit within the framework may be found and applied, but they are context-sensitive and described elsewhere.

The Guide's reasoning is that Scrum is an experiment machine. Each element produces a kind of information or a kind of pressure. A missing element does not simply reduce a benefit. It removes the information the team would have used to see that something was wrong, which is why the Guide says omission covers up problems.

A test for any change

When someone proposes a change, a few questions sort it.

  1. Is it an addition or an omission? Adding a practice, such as a team working agreement or a limit on work in progress, sits inside the container. Dropping an event, an artifact or an accountability removes a part.
  2. What did that element do for us? Name the purpose. The Retrospective's purpose is to plan improvement. The Definition of Done's is a shared standard of quality. If you drop the element, who now does that job?
  3. What problem does the change address? If the answer is "the event is boring", the fix is to change how it is run, not to remove it. If it is "the Sprint is too short for our release process", the fix may be to improve the process.
  4. Does it hide anything? A change that makes information less visible, such as a Sprint Review closed to stakeholders, makes problems harder to see.
  5. Is it a trial with an end? "We will try X for three Sprints and review" is an experiment. "We have always done X" is not.
  6. Who benefits? Changes that serve convenience at the cost of quality or openness should be viewed with suspicion.

A change that is an addition, serves a named purpose and can be reviewed is usually fine. A change that is an omission, serves comfort and has no review date is Scrum-but.

Common examples

The "but" The element removed What disappears
...but we skip the Retrospective A formal chance to improve The team's own improvement loop
...but the Product Owner is a committee A single accountable person A clear order and fast decisions
...but we have no Sprint Goal The commitment to a single objective Focus and a basis for trading scope
...but Sprints vary in length Fixed length Consistency and the ability to forecast
...but we don't show stakeholders until the end Regular inspection Early feedback
...but the manager assigns tasks Self-management The team's ownership of how
...but we only test at the end The Definition of Done A usable, verified Increment each Sprint
...but the Scrum Master is also the line manager Servant leadership Openness, because the team reports to its coach's boss

Each of these is understandable. The first usually comes from a boring Retrospective, the second from a wish to share responsibility, the third from a feeling that the work is too varied for a goal. In each case the cause is real and the removal does not solve it.

What is not Scrum-but

Many adaptations are healthy.

  • Adding practices: pairing, test-driven development, a working agreement, a health check, limits on work in progress. The Guide allows them.
  • Choosing a Sprint length within the Guide's limit of a month. The Guide leaves the length to the team.
  • Choosing the Daily Scrum format. The Guide gives the Developers the choice.
  • Choosing estimation methods, or none.
  • Using tools or boards of any kind.
  • Adding events around the core, such as a refinement session or a cross-team meeting, so long as they do not replace the five.
  • Using SBOK processes alongside the Guide's framework.

None of these changes the accountabilities, events or artifacts. They are decisions the Guide expects the team to make.

A worked example

This is an illustrative team. Its Retrospectives have dropped in quality: the same three people talk, the same complaints arise and nothing changes. One Developer proposes dropping the event: "we are doing Scrum, but retros are a waste, so we'll do them only when something goes wrong."

The Scrum Master applies the test. It is an omission. The Retrospective's purpose is to plan improvement, and if it goes, nobody takes on that job. The problem it addresses is a poor Retrospective, which can be changed. It hides something: problems that never reach "something went wrong" will stay unspoken. There is no review date. The benefit is comfort.

She proposes an experiment instead. For three Sprints, change the format each time, limit actions to one, name the owner and check the previous action first. See when retrospectives go stale. The Developer agrees to try it. After three Sprints, two actions have been completed and a recurring problem with review delays is solved. The team keeps the event and keeps changing the format.

The alternative, dropping the event, would have saved an hour a fortnight and lost the one place where the review delays were noticed.

Responding to Scrum-but

Ask the purpose question rather than citing the rule. "What would that event have told us?" works better than "the Guide says no."

Make the cost visible. Show the data: time lost to defects found late, decisions that waited, the improvements not made.

Offer a time-boxed experiment. People who cannot agree to a permanent change may agree to a trial.

Be honest about naming. If the team chooses to leave parts out, calling the result something else, such as a team-specific method that borrows from Scrum, is more honest than calling it Scrum. The Guide's position is that the result is not Scrum, and using the word sets expectations that will not be met.

Look at the organisation. Many Scrum-buts are forced by the environment: a manager who needs reports, a release process that fixes the dates. The Scrum Master's work with the organisation is part of the answer.

Start with the biggest omission. Do not try to fix everything. Pick the missing element that costs the most.

Two perspectives

Only the Scrum Guide covers this.

Scrum Guide

The Scrum Guide says leaving out elements or not following the rules covers up problems, and that the framework is immutable: implementing only parts is possible, but the result is not Scrum, which exists only in its entirety as a container for other practices.

SBOK®

The SBOK® Guide presents Scrum as a framework to be fully embraced and says an organisation planning to use it must be prepared to change its work culture and habits to realise the benefits, without a term for partial adoption.

Same thing, different words

  • Scrum-but (practitioner term, in neither source)

The Guide is firm that parts-only is not Scrum. Many practitioners accept thoughtful adaptation, and the test in this post separates additions from omissions.

How to practise it

List every "but" your team uses and apply the six questions to each. Choose the one that costs most and propose a three-Sprint experiment. In the simulator the events and artifacts are all present, which lets you see the information each one produces by taking part in it.

Sources

  1. The 2020 Scrum Guide, Scrum Guides. Read on 14 October 2026.
  2. Scrum (software development), Wikipedia. Read on 14 October 2026.

SBOK® is a registered trademark of its owner. Scrumagic is independent and is not affiliated with the owners of SBOK®.

Share this post Link copied

Nothing opened? This computer may have no email program set up. Write it in Gmail or use the copy button and paste the link into your email.

  • Learn Scrum 7 min read

    What is Scrum? A plain-language guide

    Scrum is a lightweight framework for solving complex problems in small steps. One small team works in fixed-length Sprints of a month or less, shows something usable at the end of each one, and uses what it learns to plan the next. This guide explains how that works, and where Scrum deliberately stops.

  • Scrumagic 5 min read

    Scrumagic compared with courses, books and sandbox projects

    There are several honest ways to learn Scrum, and each teaches something the others do not. Books and guides give you the ideas. Courses give you a person and a structure. A sandbox project gives you real friction with real people. A simulator like Scrumagic gives you repeatable decisions with consequences. This post compares them fairly, including where Scrumagic is the weaker choice.

  • Learn Scrum 7 min read

    Scrum for startups and solo builders

    A startup or solo builder has little time, no stable plan and a lot of uncertainty, which is what Scrum was made for, but Scrum needs a team. This post asks what a one- or two-person version keeps and drops, how to hold the accountabilities with few people and how to avoid ceremony that eats the week.

  • Learn Scrum 7 min read

    How velocity gets misused, and what it is actually for

    Velocity is how much a team finished in past Sprints, used to forecast how much it can finish in the next. It is a planning aid for the team that produced it. It stops working the moment it is used to compare teams, to rate individuals or to set targets, because people then change the numbers instead of the work.

  • Learn Scrum 6 min read

    Scrum in education: classrooms, projects and course design

    Scrum can organise learning as well as software. A class or course team works in short cycles toward a goal, shows work to others and reflects on how it went. This post shows how the roles, events and artifacts map to a classroom, with a worked project example and cautions about grades.

We use analytics cookies to see which pages help and which don't. Scrumagic works the same whichever you choose, and you can change your mind any time from "Cookie settings" in the footer. Privacy Policy.