Backlog refinement: how much is enough, and what is Ready

By Scrumagic Team Last reviewed 6 min read

In short

Refinement is the continuing work of making the next backlog items clear enough to plan. The Scrum Guide treats it as ongoing and prescribes no meeting. The SBOK describes a process with an optional review meeting and a Definition of Ready, and suggests keeping two to three Sprints of work refined. Enough means the next Sprint Planning has clear items to choose from.

Two failures sit either side of good refinement. In the first, Sprint Planning opens with a story nobody has read, and the first forty minutes are spent finding out what it means. In the second, the Product Owner has written detailed specifications for the next eight months, and half of them are wrong by March. The art is in the middle: refine what is about to be needed, and leave the rest rough.

What each source says

The Scrum Guide's definition is short. Product Backlog refinement is the act of breaking down and further defining Product Backlog items into smaller, more precise items. It is an ongoing activity to add details such as a description, an order and a size, and the attributes often vary with the domain of work. Items that can be Done within one Sprint are deemed ready for selection at Sprint Planning, and they usually acquire that clarity through refinement. The Guide prescribes no meeting, and lists refinement among the things done during the Sprint as needed. The Developers are responsible for sizing, and the Product Owner may influence them by helping them understand and choose trade-offs.

The SBOK® Guide's Refine Prioritized Product Backlog process (called "grooming" in earlier editions) adds more structure. The Product Owner continuously updates and maintains the backlog, working with stakeholders to capture changes in their needs, and refines epics and stories so those intended for the next Sprint are ready for commitment. It describes a Prioritized Product Backlog Review Meeting as a tool, and a Definition of Ready as the test a story must pass.

How much is enough

The SBOK is specific. It says one of the Product Owner's key responsibilities is making sure the requirements to be included in the next two to three Sprints are refined into suitable user stories, and recommends spending a significant amount of time in each Sprint on refining. The Scrum Guide gives no figure.

Take the SBOK's figure as a starting point and adjust it. If your Sprints are short and your priorities change often, two Sprints of refined work is plenty. If your work has long lead times, such as waiting for design or legal review, you will need to look further ahead for the items that need it.

A simple check is at the end of each Sprint Planning. Did we choose from clear items? Was there a story we could not plan because we did not understand it? If so, refine more. Did we refine items that moved down or disappeared? If so, refine less.

What a session does

The SBOK says the intent of a review meeting is to make sure of four things: stories and their acceptance criteria are understood and properly written; everyone on the team understands them; the high-priority stories are refined well enough for the team to estimate and commit; and irrelevant stories are removed and approved changes or risks are incorporated.

The SBOK adds practical advice about running one. The Product Owner takes the lead and should set objectives, ideally with an agenda, because without objectives the session is unstructured. Invite only the stakeholders whose feedback is required, because too many participants lower efficiency. Include all the team members, because their input is valuable. If the session changes the order, the team should agree with the change.

An illustration of a thirty-minute session, ours and not either source's:

  1. Look at the top of the backlog and the Sprint Goal for the next Sprint.
  2. Pick the next two or three items that are not yet clear.
  3. For each, ask: what does done look like, what are we unsure of, can we finish it in a Sprint?
  4. Split anything too big, and size what is ready.
  5. Note questions for the Product Owner to answer before planning.
  6. Remove or defer one item that no longer earns its place.

Other ways refinement happens

Neither source limits refinement to a meeting. The SBOK says refining should happen throughout the project: the Product Owner writes new stories or reorders existing ones, and stakeholders or team members suggest new items. The Guide treats it as an activity, not an event. In many teams a lot happens in short conversations: a Developer asks a question about a story, the Product Owner answers, and the story improves.

Several inputs feed it. The SBOK lists rejected stories, which simply stay in the backlog unmarked as done so that they can be reordered and considered again, approved change requests, identified risks, dependencies and the lessons from the last retrospective. In other words, the backlog is where everything learned in the Sprint is turned into the next plan.

A Definition of Ready: use with care

The SBOK describes a Definition of Ready as a set of criteria a story must meet before it is estimated and included in a Sprint, for example: written in enough detail to estimate, with clear acceptance criteria, any related documents attached and small enough to complete in one Sprint. It puts the onus on the Product Owner to define requirements properly, and says the team commits only to stories that meet it.

The Scrum Guide has no such thing. Its equivalent is the plain observation that items which can be Done within a Sprint are ready for selection.

A Definition of Ready can help a team that keeps being handed unclear work. It gives everyone a reason to say "not yet". The risk is that it turns into a gate. If stories are refused for lack of a field and not for lack of understanding, it creates paperwork. Two guards help. Keep it short, perhaps four or five lines. And treat it as a conversation starter, not a checkpoint. A story that the team understands well enough to do is ready, whatever the checklist says.

Common mistakes

  • Refining everything. Far-off items change. Spend the time near the top.
  • Refining nothing until planning. The first forty minutes then go on reading.
  • Treating refinement as a meeting only. Much of it is conversation as questions arise.
  • A Product Owner who refines alone. The Developers will find gaps the Product Owner cannot see, and they do the sizing.
  • A crowd. The SBOK warns that too many participants reduce efficiency.
  • Never deleting. A backlog that only grows is not refined. Removing items is refinement too.
  • Gating on the checklist. Judgement beats form.

The Agile Manifesto principle that simplicity, the art of maximising the amount of work not done, is essential applies to refinement as much as to code.

Two perspectives

The Scrum Guide and SBOK differ here.

Scrum Guide

The Scrum Guide describes refinement as the ongoing act of breaking down and further defining Product Backlog items, with the Developers sizing them, and prescribes no meeting. Items that can be Done within one Sprint are ready for selection.

SBOK®

The SBOK® Guide's Refine Prioritized Product Backlog process keeps the next two to three Sprints of stories refined, describes a Prioritized Product Backlog Review Meeting, and uses a Definition of Ready as a test for stories before commitment.

Same thing, different words

  • Product Backlog refinement (Scrum Guide) = Refine Prioritized Product Backlog, earlier Groom Prioritized Product Backlog (SBOK)

The SBOK is more prescriptive about the meeting and the Definition of Ready. Neither source says how often to refine, and the amount depends on how fast priorities change.

How to practise it

In the simulator, the backlog is refined in the middle of a Sprint. A change request arrives, the current Sprint stays as committed, and you decide where the request belongs in the ordered backlog.

Sources

  1. The 2020 Scrum Guide, Scrum Guides. Read on 13 October 2026.
  2. Principles behind the Agile Manifesto, Agile Manifesto. Read on 13 October 2026.

SBOK® is a registered trademark of its owner. Scrumagic is independent and is not affiliated with the owners of SBOK®.

Share this post Link copied

Nothing opened? This computer may have no email program set up. Write it in Gmail or use the copy button and paste the link into your email.

  • Learn Scrum 7 min read

    Writing acceptance criteria that settle arguments early

    Acceptance criteria are the conditions a single story must meet before the Product Owner accepts it. They turn a subjective sentence into something the team can check. Written well, they are few, specific and testable. They are different from the Definition of Done, which applies to every item in the same way.

  • Learn Scrum 6 min read

    User story anatomy: who, what, why and the conversation

    A user story is a short statement of who needs something, what they need and why, written to start a conversation instead of replacing one. The "As a, I want, so that" template is a prompt, not a rule. What makes a story good is whether the team can discuss it, size it, build it in a Sprint and tell when it is finished.

  • Learn Scrum 6 min read

    Ordering the Product Backlog: value, risk and dependencies

    Ordering the backlog means deciding what comes first, and Scrum leaves the method to the Product Owner. A sound order weighs three things: the value an item delivers, the risk or uncertainty it carries, and what it depends on. Techniques such as MoSCoW, paired comparison and the 100-point method help a group reach an order, but they do not replace the Product Owner's decision.

  • Learn Scrum 6 min read

    The Product Backlog: one ordered list, never finished

    The Product Backlog is an emergent, ordered list of what is needed to improve the product, and the single source of work for the Scrum Team. It is never complete: it changes as the team learns. Items near the top are small and clear enough to finish in a Sprint, items lower down stay rough, and the Product Goal sits at the front to say where the list is heading.

  • Learn Scrum 7 min read

    Project vision and Product Goal: pointing the work somewhere

    A vision says why the work exists and where it is heading, in a few sentences that everyone on the team can repeat. The Scrum Guide calls the long-term version the Product Goal. The SBOK builds a Project Vision Statement from the business case at the very start of a project. Both ask for the same thing: focus on the problem, not the solution, and leave room to learn.