4Ls and Mad Sad Glad: learning and feeling retros

By Scrumagic Team Last reviewed 6 min read

In short

Two retrospective formats ask about experience rather than events. The 4Ls prompts are Liked, Learned, Lacked and Longed for. Mad, Sad, Glad asks how the Sprint felt. Both give a team a way to say what mattered to people, which can surface issues a process-focused format misses. This post explains each, compares them, shows a worked board and says when feelings help and when they get in the way.

Many teams run retrospectives that treat the previous Sprint as a series of events to be graded. That produces a list of process problems, which is useful, and misses a second kind of information: how the work felt, what people learned, and what they wished they had. Two common formats are built to collect it.

Where these formats stand

Neither format is defined by the Scrum Guide or the SBOK® Guide. The Guide's description of the Retrospective is deliberately broad: the Scrum Team inspects how the last Sprint went with regard to individuals, interactions, processes, tools and the Definition of Done, discusses what went well, what problems it met and how they were or were not solved, and identifies the most helpful changes. Individuals and interactions are part of it. Feelings and learning are therefore within scope. A vendor guide to retrospectives lists "Glad, Sad, Mad" among the prompts teams can use to vary the format, and suggests focusing on the sad and mad items so that, over time, the glad column fills up.

The 4Ls

The four prompts are:

Liked. What the team enjoyed or valued in the Sprint. It captures strengths, and gives a baseline of what to protect.

Learned. What people found out: a technique, a fact about the product, a mistake and its cause. It treats the Sprint as a learning cycle, which echoes the empirical idea that the Guide places at the base of Scrum.

Lacked. What was missing: information, a tool, support, time. It points to resources, which the Scrum Master or the organisation may be able to supply.

Longed for. What people wished for. It is the most open of the four and encourages ideas that do not fit under any other heading, such as "a quiet day without meetings" or "a way to see how customers use this".

The format is gentle and works well for teams that find "what went wrong" a threatening prompt.

Mad, Sad, Glad

Mad, Sad, Glad asks for emotions directly.

Mad. What frustrated or angered people: an interruption, an unfair decision, a repeated problem.

Sad. What disappointed them: a feature that was cut, a thing that could have gone better.

Glad. What pleased them: a good conversation, a hard problem solved, thanks from a stakeholder.

The vendor guide's advice is to concentrate on the sad and mad lists and ask how to improve, so that next time there are only items in the glad column. A good facilitator adds a step the board does not show, moving from the emotion to the cause and then to a change. "I was mad that the deployment failed twice" becomes "what would stop it failing twice?"

How the two compare

4Ls Mad Sad Glad
Main focus Learning and unmet needs Emotional reaction
Tone Reflective, constructive Direct, can be intense
Best for Teams that want to improve learning and spot missing resources Teams where frustration or morale is a concern
Risk Can stay abstract Can become venting or blame
Output Resource requests, ideas, protected strengths Pain points to fix, wins to repeat

A worked board

This is an illustrative 4Ls board after a Sprint in which a team integrated with a new partner system.

Liked Learned Lacked Longed for
Pairing on the integration The partner's sandbox behaves differently on weekends A named contact at the partner A way to replay failed messages
The clear Sprint Goal How to read their error codes Test data that matches real accounts One quiet day a week
Quick answers from the Product Owner Mocking the API saves a day Time to write the guide we promised A dashboard of partner response times

In the discussion, the team sees that three cards, the sandbox, the missing contact and the error codes, point to one need: reliable information about the partner. They decide to ask the Product Owner to arrange a named contact, to write up what they have learned in a short page and to pair on a replay tool in the next Sprint. "A quiet day" goes to the Scrum Master to raise with the wider organisation.

Now a Mad, Sad, Glad version of the same Sprint might have yielded: Mad, the two failed deployments; Sad, a demo that went badly; Glad, the pairing. The first board finds the cause of the deployments in the lack of information. The second finds the feeling and then needs to ask why. Neither is better. They produce different material.

Choosing between them

A simple rule of thumb: use the 4Ls when the team wants to learn and to find out what is missing, and use Mad Sad Glad when something has been bothering people and the team needs to say so. If you are unsure, start with the 4Ls, which are easier on a new group, and keep Mad Sad Glad for a Sprint that was clearly hard.

A useful variation is to combine them: ask for the 4Ls first, then ask which of the items made people glad, sad or mad. The cross-over shows which learning or lack mattered emotionally, and those are the items the team is most likely to act on.

When feelings help

They help when morale is a real constraint, when a team is not saying what it feels, or when a Sprint was stressful in a way that process questions do not reach. A team that has been under pressure for months may need to say so before anything else will work. The Guide's value of openness and its statement that team members have the courage to do the right thing and to work on tough problems apply: naming a feeling is a small act of both.

When they get in the way

  • Venting without change. If every Mad item is a complaint with no action, the format teaches people that talking is enough.
  • Blame. Emotion cards sometimes name individuals. Set the rule at the start that cards describe situations and not people.
  • Discomfort. Some people dislike talking about feelings at work. Allow anonymous cards, and do not insist on explanation.
  • Over-reading. A single angry card is not a trend. Look for patterns across the team and across Sprints.
  • Manager presence. If a manager attends, the openness of Mad cards will suffer. The Guide places the Retrospective among the Scrum Team.

See psychological safety in retrospectives for how to create the conditions in which these formats work.

Two perspectives

Neither source prescribes this, so practice varies.

Scrum Guide

The Scrum Guide has the Sprint Retrospective inspect individuals, interactions, processes, tools and the Definition of Done, discuss what went well and what problems arose, and identify the most helpful changes, without naming formats.

SBOK®

The SBOK® Guide describes the Retrospect Sprint meeting as a time-boxed discussion of what went well and what did not, aiming at actionable improvements, and also leaves the technique to the team.

Same thing, different words

  • Sprint Retrospective (Scrum Guide) = Retrospect Sprint (SBOK)

The 4Ls and Mad Sad Glad are widely used team techniques. Neither source defines them, and their wording varies between facilitators.

How to practise it

Try the 4Ls once and compare the actions it produces with those from your usual format. If they differ, keep both in rotation. In the simulator the retrospective at step 4.2 prompts reflection on what to change, and you can bring the 4Ls into your own reasoning.

Sources

  1. The 2020 Scrum Guide, Scrum Guides. Read on 14 October 2026.
  2. What are agile retrospectives?, Atlassian. Read on 14 October 2026.

SBOK® is a registered trademark of its owner. Scrumagic is independent and is not affiliated with the owners of SBOK®.

Share this post Link copied

Nothing opened? This computer may have no email program set up. Write it in Gmail or use the copy button and paste the link into your email.

  • Learn Scrum 6 min read

    Psychological safety in retrospectives

    A retrospective only works if people say what they actually think, and they only do that when they believe it is safe to. Psychological safety is the shared belief that speaking up will not be punished or ridiculed. The Scrum values of openness, respect and courage depend on it. This post covers what it looks like, what destroys it and practical ways for a team to build it.

  • Learn Scrum 6 min read

    The Sailboat retrospective: wind, anchors and rocks

    The Sailboat retrospective uses a picture of a boat heading for an island, with wind pushing it forward, an anchor holding it back and rocks ahead. It gets teams talking about forces and risks instead of events, and it ties the discussion to the goal. It works best when a team is stuck in blame or complaint. This post shows how to run it, with a worked example and cautions.

  • Learn Scrum 6 min read

    The purpose of the Sprint Retrospective

    The Sprint Retrospective is the team's regular chance to inspect how it worked, not what it built, and to choose changes that raise quality and effectiveness. It ends the Sprint, it is for the Scrum Team alone, and its measure is whether something is different in the next Sprint. A retrospective that produces a list but no change has failed, however pleasant the discussion.

  • Learn Scrum 7 min read

    The Sprint: a fixed container for turning ideas into value

    A Sprint is a fixed-length event of one month or less, and every other Scrum event happens inside it. It gives a team a regular rhythm of planning, building, inspecting and adapting. Its length is the team's first big planning decision, and the main rule is that the Sprint Goal is not endangered once it starts.

  • Learn Scrum 7 min read

    Sprint Planning: purpose and structure

    Sprint Planning is the event that starts a Sprint. The whole Scrum Team agrees why the Sprint is valuable, what can be finished in it, and how the chosen work will get done. It ends with a Sprint Backlog: a goal, the items chosen to serve it, and a plan the Developers can follow.

We use analytics cookies to see which pages help and which don't. Scrumagic works the same whichever you choose, and you can change your mind any time from "Cookie settings" in the footer. Privacy Policy.